UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 10 Issue 8
August-2023
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2308733


Registration ID:
524744

Page Number

h303-h311

Share This Article


Jetir RMS

Title

Application of MSP in planning and design of G+10 building

Abstract

Project management is the research and practice of a project's design, execution, control, & closure to ensure that the project's aims and goals are attained. The traditional construction approach often proves inefficient, time-consuming, and error-prone, leading to complexities in execution. This research advocates for the adoption of Microsoft Project as a modern Project Management tool to surmount challenges posed by conventional planning and management methods. This software optimally organizes project activities, offering a clear path to project completion within the defined timeframe and budget. The study demonstrates the application of Microsoft Project in the context of construction management, encompassing planning, scheduling, resource allocation, tracking, & more. The research also emphasizes efficient resource utilization and waste reduction during construction projects. By comparing software-generated results with on-site outcomes, the study establishes the effectiveness of the proposed method. Notably, the study showcases Microsoft Project's influence on cost savings through meticulous planning, scheduling, resource allocation, and tracking. The goal of current research is to use the Microsoft project in effective planning & implementation of construction projects. The project implementation plan, cost overview, resource allocation are presented for G+10 story building. The maximum cost is incurred by the TM mixer machine, i.e., ₹ 14,050,000, and minimum cost is incurred by concrete mixer machine. The actual cost of work performed is Rs 27,162,425, whereas the actual cost is Rs 56202804.59. Using the MSP, the cost savings of Rs29,040,379.59 is achieved due to proper planning, scheduling, resource allocations, levelling, tracking, etc. From the MSP data, it can be concluded that the maximum work hours required for male labour force, i.e., 70000hrs.

Key Words

MSP, planning, G+10

Cite This Article

" Application of MSP in planning and design of G+10 building", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.10, Issue 8, page no.h303-h311, August-2023, Available :http://www.jetir.org/papers/JETIR2308733.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

" Application of MSP in planning and design of G+10 building", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.10, Issue 8, page no. pph303-h311, August-2023, Available at : http://www.jetir.org/papers/JETIR2308733.pdf

Publication Details

Published Paper ID: JETIR2308733
Registration ID: 524744
Published In: Volume 10 | Issue 8 | Year August-2023
DOI (Digital Object Identifier):
Page No: h303-h311
Country: Gwalior, Madhya Pradesh, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

00078

Print This Page

Current Call For Paper

Jetir RMS